Designed to join beams with columns and for other applications where
additional reinforcement is required.
MATERIAL: See table
FINISH: Galvanized (7ga) or Prime Paint (7ga)
FASTENERS: See table L B L
Factored Tensile Resistance has been increased by 15 % for short-term
load duration (wind, earthquake).
Nail holes in the center flange are provided to allow pre-attachment
to the rim joist.
Holes spacing (dim. D) is 2 1 /2, 3 and 3 1 /2 for 5 /8, 3 /4 and
7 /8 MB respectively..