• Skip to primary navigation
  • Skip to main content

SAFETY | INTEGRITY | VALUE | SINCE 1974

1-800-293-0133 info@canadascaffold.com

Canada ScaffoldCanada Scaffold Vancouver

Experts In Scaffold

  • Services
    • Scaffold
      • Rental and Sales
      • Scaffold Installation
    • Event & Film Rentals
      • Public Access Decks
      • Stages
      • Marquee & Frame Tents
      • Towers
      • Bleachers & Grandstands
      • The Bar
    • Shoring Systems
    • Structural Steel
    • Swing Stage
      • Rental Equipment
      • Permanent Equipment
      • Safety Equipment
    • Material Hoist
    • Temporary Fencing
    • CSS Connectors
    • Portables and Tank Services
    • Safety and Training
    • Testing and R&D
  • Training/CSU
    • Frame Scaffold Training
    • System Scaffold Training
    • Instructors
  • About
    • Why Work Here
    • Team
    • History
  • Projects
  • Careers
  • News
  • Store
  • Contact

Basic Safe Work Procedures for Scaffold Erection

Posted on: June 14, 2014 Category: Professional Consultations, Tags: augue quis, bibendum mauris, elit, ipsum dolor, tempor

  • Before scaffold erection a short tool box meeting must be held by the erection crew to discuss erection procedures.
  • One member of the crew will go to the roof to locate appropriate anchors for lifelines. If the tear-down consists of 10 frames or nine bays wide, at least 4 ropes will be required. If anchor points are available on rope should be utilized for every 2nd or 3rd bay of scaffolding. Be aware if a possible swing fall hazard. Anchor points must be able to withstand 5,000lbs.
  • The crew will then discuss and fill out the required site-specific fall protection plan including rescue procedures .
  • If it is required the area will be cordoned off to prevent entry by unauthorized workers. Ensure no other work is being performed directly above where you will be erecting scaffolding.
  • Using base plates/screw jacks stand end frames ensuring adequate sills or pads are used.
  • Connect the end frames with cross braces ensuring the unit is plumb and level.
  • Install planks (minimum 20″ wide) or manufactured aluminum deck.
  • Install the second row of end frames from the deck and install cross braces. Install handrails, if required, pig tails and endstops.
  • The worker on the top section must utilize fall protection equipment. Install the third row of end frames from the deck below. Install planks or manufactured decks from below.
  • Install cross braces, guard rails, pig tails and endstops.
  • Ensure building tie-ins are installed as work progresses. If three foot wide frames are used, the first row of building tie-ins will be at 9 feet (three times the minimum base dimension). The minimum distance for vertical tie-ins after this point is 20 feet. Horizontal tie-ins must be placed at a minimum distance of every third bay or 21 feet, whichever is less. Tie-ins must also be placed at each end of the scaffold.
  • Ensure adequate access to the scaffold is maintained at all times.

Note: The above procedures will vary somewhat depending on the type of components used, i.e. width and height of frames. Rescue Procedures

  • Each crew is equipped with a cellular telephone.
  • If a worker falls and is suspended by fall arrest equipment he will initiate self-rescue if possible.
  • If self rescue is not possible fellow worker(s) will initiate rescue procedures.
  • If fellow worker(s) cannot effectively and safely assist with rescue procedure,
  • CALL 911.
  • Share this on:

See Also:

Read More

October 07, 2014
Posted In: Professional Consultations, Safety,

Saving Lives: Swing Stage Safety Practices

Occupational health and safety practices is serious business in the construction industry especially after the Toronto 2009 tragedy where several workers plunged to their deaths from a 13-storey high rise after a swing stage malfunctioned. By mid 2014, after the [...]

Read More
Back to News

Sort By Subject

Community Service Fall Protection First Aid Hand Protection Hot News Our Development Professional Consultations Safety Safety Communication Scaffolding Safety Uncategorized
Your team is one of the most accommodating and efficient teams I've ever had the pleasure of working with. Truly the best of the best. Thank you and your team for your ongoing generosity and partnership in putting on our largest community celebration of the year. I look forward to working with you all again for LOH 2020.
Bonny Bung - Special Events Officer
Lights of Hope, St. Paul's Foundation
Request a Quote

Locations

  • Head Office
    11331 Twigg Place
    Richmond, BC V6V 3C9
  • Kelowna Office
    250 Edwards Road
    Kelowna, BC V1X 8G6
  • Duncan Office
    2699 Sahilton Road
    Unit D
    Duncan, BC  V0R 2C0

Services

  • Scaffold
  • Structural Steel
  • Shoring Systems
  • CSS Connectors
  • Safety and Training
  • Swing Stage
  • Temporary Fencing
  • Event Rentals
  • Portables and Tank Services
  • Material Hoist
Canada Scaffold Supply Co. Ltd. Cartoon Person
  • Sitemap|
  • Privacy Policy|
  • Terms of Use|
  • Contact|
Canada Scaffold Supply Co. Ltd.
© 2025, All Rights Reserved.

Web Design by Ambr Digital

SUBSCRIBE FOR UPDATES

Be the first to find out about all the major announcements and breaking news from the #BCTECH Summit.